The Cardones-Polpaico project
TRANSMISSION & DISTRIBUTION PROJECT

The project aims to increase the transmission capacity of the Cardones-Polpaico high-voltage line, located 50 km from Santiago de Chile.

The 753 km Cardones-Polpaico transmission line project is divided into three sections:

  • Nueva Cardones – Nueva Maitencillo

  • Nueva Maitencillo – Nueva Pan de Azúcar

  • Nueva Pan de Azúcar – Polpaico

    The line crosses Chile from north to south.
    This transmission line is Chile’s largest energy infrastructure project of the last 50 years.
    It uses a 500kV double-circuit line and a total of 1,728 towers.
    It gives Chile a more efficient electricity market, with greater security of supply, greater sustainability and, above all, lower costs.

Disconnectors
6 SBE 24Kv/2000A outdoor three-pole vertical disconnectors
2 SBE 24Kv/4000A outdoor single-pole vertical disconnectors
4 SBE 24Kv/8000A outdoor single-pole vertical disconnectors
Switch
8 Outdoor three-pole switch-disconnectors ST90

Smart drive
20 MR41E universal Smart Drive controls
Cechnical specifications

In 2019, SDCEM proposed electrical switch and disconnector solutions combined with intelligent universal drives to meet the technical challenge of managing and securing networks.