Marmaray railway tunnel
RAIL ELECTRIFICATION PROJECT

The Marmaray project in Turkey represents the first physical rail link between Europe and Asia.
It will link the Asian and European shores of Istanbul via a 76.3 km metro-type rail tunnel under the Bosphorus Strait.

The project includes the modernization of 63 km of commuter rail lines, to improve the Gebze-Haydarpasa and Sirkeci- Halkali rail lines, as well as the 13.6 km two-track underwater rail tunnel under the Bosphorus.

The Marmaray project involved the construction of a tunnel under the Istanbul Strait.
This tunnel is considered to be the deepest submerged structure in the world, at 55 m below sea level.

Its length is 13.6 km (8.5 miles), with 9.8 km of bored tunnel, 2.4 km built using cut-and-cover methods and the remaining 1.4 km as a tubular tunnel.

The submerged tunnel is connected to the coast by tunnels dug to produce separate holes for each racing line, with frequent interval connections for emergency use.

The system also included the modernization of 63 km of existing commuter rail lines, and the reconstruction and construction of 37 new three-station stations.
The stations are based on metro-type operations, but are also served by heavy trains capable of running at 100 km / h with an average speed between stations of 45 km / h.
The Marmaray project provides an east-west transport corridor with a connection to Yenkapi on the north-south metro line, also under construction.

12M

Number of passages per day in the center of Istanbul

76.3Km

Total line length

13.6 Km

Length of the Bosphorus underwater rail tunnel

37

Number of stations

Oct 2013

Inauguration for the 90th anniversary of the Turkish Republic

4.5 billion

total project cost

single-phase 25kV

traction power supply system with 36 stations (stops)

Technical specifications :

Traction supply for the electrification of catenaries for the design, installation, supply and traction testing of substations:

  • 6x154kV/25kV50Hz
  • 1 x 34.5 kV / 25 kV 50 Hz (temporary station)
  • 5 x 25kV 50Hz, isolation and automation stations with systems based on IEC61850 protocol (standard design for electrical automation substations)

In 2013-2014, SDCEM supplied disconnect switches, load break switches and control and monitoring solutions to EYM installations for the substation traction project.
SDCEM products:

Disconnectors
15 Rocking disconnectors SBR 52kV 2500A (earthing disconnectors)
40 Rocking disconnectors SBR 52kV 2500A (earthing disconnectors)
43 Rocking disconnectors SBR 52kV 2500A
4 Vertical disconnectors SBE 52kV 1250A in boxes
Switches
8 IT25 52kV 2000A vacuum circuit-breakers (earthing switches)

Control & Monitoring
40 T70 manual controls
81 MR41E electric controls with S-COM Modbus RTU protocol and fiber optic connection