Gouvães hydroelectric power plant
PROJECT ENERGY PRODUCTION
The Gouvães hydroelectric power station will be the heart of one of Europe’s largest hydroelectric projects: Alto Támega, comprising three hydroelectric power stations (Alto Tâmega, Daivões and Gouvães).
The complex is located in a vast area within the Trás-os-Montes region, in the Tâmega river basin in northern Portugal, close to the seaport of Porto.
Gouvães has four 220 MW reversible turbine groups, with a total capacity of 880 MWh.
The plant will cover peak power requirements and provide fast-response regulating power.
In total, the three power plants will generate 1,766 GWh of electricity.
Disconnectors
Smart drive
20 MR41E universal electric controls
SDCEM supplied phase reversing and generator braking disconnectors with electrical controls. SDCEM also provided customized solutions to meet the end customer’s technical specifications (specific wiring, customized painting, etc.).
- Country Portugal
- Market Energy generation
- Delivery date : 2020
- Voltage / Current Voltage : 24kV
- End customer IBERDROLA
- EPC Andritz Hydro GMBH
- Delivery date : 2021